
EVN earlier built the Quang Trach I Power Plant at a cost of over VND41 trillion in Quang Binh Province.
The Ministry of Industry and Trade had earlier warned of power shortages of 3.7 billion kWh in 2021 and nearly 10 billion kWh the following year, as construction of new thermal and gas-fired plants fall behind schedule.
2023 will be the most stressful with the shortage expected to be around 15 billion kWh. From then on, it will decrease, with shortages expected to drop to 7 billion kWh and 3.5 billion kWh in 2024 and 2025 respectively.